Projects
Maintenance Services
Water and Sewage Infrastructure
Beit Shemesh
Sorek collector
Construction of gravity PE pipe 1200mm for sewerage.
Construction of gravity GRP pipe 1800 mm for sewerage.
Crossing flowing rivers, and landscape restoration.
Total length 3.5 Km.



























Beit Shemesh
Project 2.6
Construction of crossing pasgul line in diameters of 710mm,
630mm, 500mm, 450mm, 355mm.
Total length 10Km.










Beit Shemesh
Ishi collector
Construction of gravity pipe in different diameters up to 1200mm.
Crossing flowing rivers, and landscape restoration.
Total length 3 Km.


















Tunneling Work
Beit Shemesh
Road 10
Construction tunneling in pipejacking
OD 2160mm up to 5 Km total drives.