“THE ROAD TO SUCCESS IS ALWAYS UNDER CONSTRUCTION”
Vision
”To be the most preferred choice for the customers thanks to the excellence in the execution’s quality and to become a leading infrastructure company in the Israeli market.”
Projects
Igudan
Construction of sewerage concrete line 1.2Km OD3000mm Including groundwater and marine works.
Ishi collector
Construction of gravity pipe in different diameters up to 1200mm. Crossing flowing rivers, and landscape restoration. Total length 3 Km.
Project 2.6
Construction of crossing pasgul line in diameters of 710mm, 630mm, 500mm, 450mm, 355mm. Total length 10Km.
Sorek collector
Construction of gravity PE pipe 1200mm for sewerage. Construction of gravity GRP pipe 1800 mm for sewerage. Crossing flowing rivers, and landscape restoration. Total length 3.5 Km.
WWTP Shaffir Expansion
Construction of reservoir civil engineer, intricacy electromechanics work, reactor, pumps and construction of 80” steel pipeline. All the construction done while the WWTP keep serving the water utility without any disturb.